top of page

Projects

edesix-multi-charger.jpg
TFL_7605.webp

Telecoms / Networking

TfL Body Cam Rollout

Capita (IT Services) 

 

Following a successful trial, Brookvex on behalf of Capita commenced phase II and surveyed 306 Transport for London bus and train stations.

 

From our findings, we quickly determined the easiest means to roll-out the body cam for thousands of Transport for London workers to start using body-worn cameras to help protect from verbal and physical assault.

 

Our Scope

Non-Intrusive Surveys

Intrusive Surveys

Minor Electrical

Data / CMS Installation

Telecoms - Capita

Telecoms / Networking

Connect Framework

Thales

 

Our telecommunication team is delighted to announce the award of the ‘Connect’ framework with Thales Transport, which provides signalling and communication support across Transport for London.

 

Over the next 3 years, Brookvex, along with 3 other service partners, will upgrade the railway system’s infrastructure to support capacity improvements recently made by Transport for London.

Telecoms - Thales
KrisHumphreysPhotographyc_-96.jpg

Building Services

Science Museum - London

Engie

 

Illuminate is a progressive new award-winning venue designed to both anticipate and surpass the needs of the ever-evolving events industry.

Brookvex Building Services undertook the full refurbishment of the illuminate event rooms on both the 4th and 5th floor, the lift lobby areas, cloakroom, and the spiral staircase.

Due to the high demands, of the venue, works were completed in  7 days.

Painting

Carpentry

Minor Electrical

LED Lighting

Fire Stopping

Fire Doors

Telecoms

Building Services - Engie
Hitchin-Station-After-2.jpg

Building Services

Dagenham East Station

London Underground

We worked collaboratively with London Underground to update the infrastructure and to alleviate all potential disruptions to the station by undertaking a series of linked work packages that enabled London Underground to continually provide excellent infrastructure availability.

The following scope was undertaken as part of the project:

GPR Survey

CMS / Cabling

Improvement Works

LED Lighting

Electrical & Small Power

CCTV

Car Park – Paving

 

Our works included surveys, design, testing for Section 12 compliance and implementation. Brookvex's experience and knowledge of London Underground assisted our client to deliver the project without incident, on time, and most importantly without disruption to passengers.

Building Services - LUL
IMG_0125.jpg

Electrical

Mayfield School

Engie Regeneration 

 

Our project at Mayfield School consists of a two-story school extension with four classrooms and two group rooms per floor plus auxiliary services.

Our scope included a controlled lighting system within the rooms completely fitted out for all power requirements for classroom machinery and desk provisions and all lv/elv requirements.

 

The external requirements within this project were to supply and install all exterior lighting to the structure of the building 

All elements of the electrical & mechanical fit-out were tested and certified.

Electrical - Engie Regeneration

Electrical

Statutory Electrical Testing

Pan TfL / Engie

 

Brookvex is delivering preventative "Statutory Electrical Testing" maintenance collaboratively with Engie, across 57 TfL stations and 12 lineside buildings.

These critical works keep London Underground stations and associated sub-buildings compliant with BS7671.  

 

All Electrical testing is carried out by a competent person (Level 3 - Isolations) fully versed in the system installed. The incoming supply to distribution switchboards is isolated by locking off LV circuit breakers, fuse switches, and supplies from other distribution switchboards prior to inspection

Electrical - Pan TfL
JDRM-Engineering-Perrysburg-Middle-Schoo

Mechanical

Uphall School

Engie Regeneration

 

Brookvex worked in conjunction with the main contractor, to deliver the mechanical & electrical installation on the new Uphall School in Ilford. 


The project involved the completely new installation of all 6 classrooms which included all electrical works in the open plan learning areas, assembly hall, gym hall as well as the external lighting and time out areas.

The installation of a new BMS allows the facility to monitor water consumption through smart metering and monitoring.

 

Brookvex provided a whole new energy-efficient boiler system that will provide full heating functions to the school.
 

 In addition, we provided full domestic water supplies throughout the building as well as an above-ground foul and waste drainage system connecting all sanitary appliances and condensate drains, including all gas services required along with all mechanical ventilation systems within the school such as the extractor fan in the kitchen areas.

Mechanical - Engie Regeneration
Railway station tracks .jpg

Security & Fire

Fire Strategy @ Ilford Depot

Fire Strategy @ 7 DLR Stations 

Fire Strategy @ Witham Station

SNC Lavalin

 

Fire Stopping / Doors @ The Science Museum

Engie

Access Control @ TfL

Telent

CCTV Installation & Maintenance @ London Crown Courts

Engie

CCTV Install & Maintenance @ Islington Borough Schools

Engie

Telephone Services @ TfL

Daisy Communications

Traffic Light Maintenace @ TfL

Telent

Security & Fire
bottom of page